Skip to content
Free Demand Writer
Menu
Free Demand Writer

Free Utility Overbilling / Wrongful Shutoff Demand Letter

A utility overbilling letter asks an electric, gas, water or sewer utility to correct bills that are wrong, test the meter, and refund or credit the overcharge. When the utility has shut off service, or threatens to, over a disputed bill, the letter also asks that service be restored or protected while the dispute is reviewed. The bills and meter readings carry the claim.

Free Demand Writer reads the bills, meter photos, disconnection notices and dispute correspondence you upload and drafts an editable Word letter. It tables each billing period with its reading, usage and amount, compares them with earlier periods, and sets out the dispute history in date order. The utility's tariff, its dispute process and the role of the state utility commission are described in general terms, with state rules marked [VERIFY].

New to this kind of letter? Our guide explains what goes into a demand letter, when to send one and what happens next.

  • Free
  • No sign-up
  • Editable Word (.docx)
  • Files deleted after drafting

When to use this letter

Use this letter when a utility bill does not match the service your client used, or service was cut off over a disputed bill. Typical cases:

  • A sudden jump in usage with no change in the household or business.
  • Months of estimated readings followed by a large catch-up bill.
  • A meter that serves another unit, or a bill for a meter at the wrong address.
  • A rate or tariff class that does not match the type of service.
  • A shutoff or disconnection notice sent while the bill was being disputed.

Most investor-owned utilities follow a tariff and dispute process overseen by the state utility commission. Municipal utilities and cooperatives may follow different rules. Shutoff protections vary by state. Check which apply before sending.

What to upload

Upload up to 5 PDFs, 500 pages in total. The disputed bills and the bills before them matter most.

Disputed bills
Every bill in the disputed period, with the reading type (actual or estimated), usage and charges.
Earlier bills
Bills from the same months in prior years, or the months before the problem, for comparison.
Meter readings
Photos of the meter with dates, or the utility's usage history from its website.
Shutoff notices
Any disconnection notice, shutoff record or reconnection fee bill.
Dispute correspondence
Notes of calls, letters, emails and any complaint filed with the state utility commission.
Hardship documents
Medical certificates or other documents the client gave the utility, if relevant to a shutoff.

What the draft includes

An editable Word letter built only from what your documents say. Missing facts become [ADD: …] placeholders, never guesses, and any law cited is marked [VERIFY].

  1. Please verify box. A short notice at the top reminding the reviewer that this is an unverified AI draft.
  2. The account. The service address, type of service and rate class shown on the bills.
  3. Billing table. Each billing period with the reading, usage, amount and source page.
  4. The error. Estimated reads, a wrong meter, a back-bill or a rate error, as the documents show.
  5. Shutoff section. Any disconnection or threat of one, with dates and amounts, if the documents show it.
  6. Legal basis. The utility's tariff, its dispute process and state commission oversight, with state rules marked [VERIFY].
  7. The demand. A meter test, corrected bills, a credit or refund, and restored service, by a deadline you set.

Before you send it

The result is an unverified AI draft for attorney review, not legal advice.

  • Check each billing period in the table against the bills.
  • Confirm whether the utility is regulated by the state commission, or is municipal or a cooperative.
  • Check the state's rules on back-billing, estimated reads and shutoff during a dispute.
  • Set the deadline and any amount, and remove the Please verify box.

Common mistakes

Utilities handle billing disputes through set procedures. These are the errors that slow a dispute down.

  • No comparison period A bill looks high only next to normal usage. Upload bills from before the problem.
  • Missing the estimated reads Many overbilling disputes start with months of estimates. Check the reading type on each bill.
  • Skipping the utility's dispute process The utility may require a formal dispute before a commission complaint. Follow its process and cite it.
  • Waiting on a shutoff notice A disconnection notice may have its own deadline. Raise the dispute promptly and ask that service be protected.

Free utility overbilling / wrongful shutoff demand letter template

Prefer to write it yourself? Download a plain Word template with fields to fill in. No AI, no email needed. Sample template, not legal advice.

Questions

Is the utility overbilling demand letter free?

Yes. No account and no payment.

Can it ask for a meter test?

Yes. Every draft asks the utility to test or audit the meter and to correct the bills based on the results.

Does it work for business accounts?

Yes. It fits household and commercial accounts for electric, gas, water and sewer service.

Will it file a complaint with the state utility commission?

No. It drafts the letter to the utility. It can note that a commission complaint is an option, and your attorney decides whether to file one.

What happens to the documents I upload?

They are deleted as soon as the draft is generated. The Word file is deleted after 48 hours or 3 downloads.

Fictional sample

See a sample draft

We made up a case file and ran it through Free Demand Writer, the same way your documents would be. This is the unedited draft. Everything in it is fictional: the people, the companies and the facts. A Kentucky homeowner in a duplex was billed on estimated reads and then on his neighbor's meter, and received a shutoff notice while his wife relies on a home oxygen concentrator.

Fictional case file: disputed_and_prior_bills.pdf, meter_photos_and_readings.pdf, shutoff_notice_and_dispute_log.pdf · State: Kentucky

Page 1 of a fictional sample utility overbilling / wrongful shutoff demand letter drafted by Free Demand Writer Download sample PDF

Fictional sample. Not legal advice. Your draft is built from your own documents.

Fictional sample · letter text

PLEASE VERIFY BEFORE SENDING

Unverified AI draft. Every fact must be checked against the records before use. It is not legal advice. Fill in every [ADD: …] placeholder, set the demand amount, confirm anything marked [VERIFY], and delete this box before sending.

  • 1 citation could not be confirmed against the uploaded files (wrong page, or an amount or date not found on that page). It is marked [VERIFY: citation not confirmed].
  • Meter numbers. The 2024 bills show meter 74120938, which matches the faceplate on the client's "418" meter. Bills since September 9, 2025 show 74120983, which matches the "418A" neighbor meter. Tri-River's online history says a meter exchange was recorded in August 2025 with new meter 74120983, but the client's meter still reads 74120938 in the December 20, 2025 and January 20, 2026 photos. Confirm the digits and photos, and obtain any exchange work order.
  • Source of the reads. The December 9, 2025 bill gives a previous read of 41,880 (August 6, 2025) and a present read of 52,380. The records do not say which meter either read came from. The letter compares 52,380 only to the photographed readings and asks Tri-River to identify the meter. The 10,500 kWh total is my sum of the four bills. It equals 52,380 minus 41,880, so please check it.
  • Totals. $1,365.00, $546.60, $989.37 and the late fees ($10.77 + $13.38 = $24.15) are as read from the bills and notice. I found the stated rate ($0.124/kWh plus $15.75) consistent with the billed usage and amounts, so the letter treats the error as a usage and meter issue, not a rate issue. Confirm that framing.
  • Shutoff status. The notice says service may be disconnected on or after January 27, 2026. Confirm the letter date and whether service is still on. Also confirm whether Tri-River has acknowledged the January 14 medical certificate (the letter has a placeholder).
  • Medical and neighbor information. Mrs. Pennington's oxygen use is included only to support the shutoff section. Confirm client consent. She is called Mr. Pennington's wife based on his own log. The neighbor's meter number and readings are included without her name. Confirm the firm wants that included.
  • Client's own log. The dispute history, agent name, reference numbers and the January 23, 2026 Tri-River letter come from the client's log, and the letter is only quoted there. Obtain a copy of the January 23 letter and confirm no later contact or meter test has occurred.
  • Demand terms. The firm notes ask for a meter check, corrected bills, late-fee removal and written confirmation of no shutoff. They do not seek other payment. The demand amount and response deadline are placeholders. Decide whether to ask Tri-River to waive the $45.00 test fee quoted on December 18, 2025.
  • Kentucky law. Four [VERIFY] items remain: whether the Kentucky PSC regulates Tri-River, back-billing and estimated reads, shutoff during a dispute, and medical certificates. No statute or regulation numbers are cited.
  • Missing details. Firm address, date, delivery method, Tri-River dispute address and any Tri-River case number.

Ashby Calhoun PLLC
[ADD: firm street address]
[ADD: city, state ZIP]
[ADD: phone] · [ADD: email]

[ADD: date]

VIA [ADD: delivery method]

Billing Disputes
Tri-River Electric Service Company
[ADD: utility dispute address]
[ADD: city, state ZIP]

Re: Billing dispute, request for meter test, and notice of medical certificate. Customer: Harold Pennington, account ending 5521, 418 Sycamore Run Road, Bellwood Junction, Kentucky. Disputed period: August 6 to December 5, 2025. Disconnection notice dated January 12, 2026. Kentucky PSC informal complaint no. 2026-INF-00317. Tri-River case number: [ADD: Tri-River dispute or case number, if any]

Dear Billing Disputes Department:

Introduction

We represent Harold Pennington, the account holder at 418 Sycamore Run Road, Bellwood Junction, Kentucky, account ending 5521 [disputed_and_prior_bills.pdf p.1]. Mr. Pennington asks that Tri-River test his meter, correct his bills to the usage on his own meter, remove the late fees, and confirm in writing that service will not be disconnected while this dispute is open [firm notes]. This letter sets out the basis for those requests.

The account

Mr. Pennington receives electric service under Tri-River's Residential Service rate, $0.124 per kWh plus a $15.75 monthly customer charge [disputed_and_prior_bills.pdf p.1] [VERIFY: citation not confirmed]. His home is one side of a duplex. The other side, 418A, is rented by a different tenant who has her own Tri-River account. The two electric meters are mounted side by side on the north wall, and each carries a tag reading "418" or "418A" [meter_photos_and_readings.pdf p.1].

For the same four billing periods one year earlier (August 6 to December 5, 2024), every read was actual, and the bills show meter number 74120938. Usage ran from 870 to 1,140 kWh per month [disputed_and_prior_bills.pdf p.1].

Billing period (2024)Read typeUsageAmountSource
Aug 6 to Sep 5, 2024Actual980 kWh$137.27[disputed_and_prior_bills.pdf p.1]
Sep 5 to Oct 7, 2024Actual870 kWh$123.63[disputed_and_prior_bills.pdf p.1]
Oct 7 to Nov 5, 2024Actual910 kWh$128.59[disputed_and_prior_bills.pdf p.1]
Nov 5 to Dec 5, 2024Actual1,140 kWh$157.11[disputed_and_prior_bills.pdf p.1]
Total (as read from the bills)3,900 kWh$546.60[disputed_and_prior_bills.pdf p.1]

Mr. Pennington reports that the household has not changed: the same two people and the same appliances, and the home is heated with natural gas, not electricity [meter_photos_and_readings.pdf p.1].

The billing errors

Three problems appear on the face of the records: estimated reads, a meter number that does not match Mr. Pennington's meter, and a large December bill that adjusts for the estimated periods.

Estimated reads. Tri-River billed three consecutive periods on estimated reads and then a fourth on an actual read. The December 9, 2025 bill states: "Actual read obtained. Usage includes adjustment for prior estimated periods. Previous read 41,880 (actual, Aug 6, 2025). Present read 52,380." [disputed_and_prior_bills.pdf p.1]

Billing periodReading as billedUsageAmountSource
Aug 6 to Sep 5, 2025Estimated1,450 kWh$195.55[disputed_and_prior_bills.pdf p.1]
Sep 5 to Oct 6, 2025Estimated1,520 kWh$204.23[disputed_and_prior_bills.pdf p.1]
Oct 6 to Nov 5, 2025Estimated1,610 kWh$215.39[disputed_and_prior_bills.pdf p.1]
Nov 5 to Dec 5, 2025Actual5,920 kWh$749.83[disputed_and_prior_bills.pdf p.1]
Total (as read from the bills)10,500 kWh$1,365.00[disputed_and_prior_bills.pdf p.1]

The four bills together account for 10,500 kWh, which is the difference between the two reads stated on the December 9 bill (52,380 minus 41,880). The same four months in 2024 totaled 3,900 kWh [disputed_and_prior_bills.pdf p.1].

Meter number. Starting with the September 9, 2025 bill, the meter number printed on Mr. Pennington's bills changed from 74120938 to 74120983. He was not told that his meter had been replaced [disputed_and_prior_bills.pdf p.1]. Mr. Pennington photographed both meters on December 20, 2025 and January 20, 2026 [meter_photos_and_readings.pdf p.1]:

Date and timeMeter tagMeter number on faceplateReadingSource
Dec 20, 2025, 8:14 a.m.4187412093845,912[meter_photos_and_readings.pdf p.1]
Dec 20, 2025, 8:15 a.m.418A7412098352,604[meter_photos_and_readings.pdf p.1]
Jan 20, 2026, 7:52 a.m.4187412093846,958[meter_photos_and_readings.pdf p.1]
Jan 20, 2026, 7:53 a.m.418A7412098354,571[meter_photos_and_readings.pdf p.1]

The meter number on Mr. Pennington's bills since September 2025 is the number on the meter tagged "418A," not the meter tagged "418." The present read on the December 9, 2025 bill (52,380) is close to the reading Mr. Pennington photographed on the 418A meter on December 20, 2025 (52,604). It is well above the reading on his own meter that day (45,912) [disputed_and_prior_bills.pdf p.1; meter_photos_and_readings.pdf p.1]. On Mr. Pennington's own meter, usage from December 20, 2025 to January 20, 2026 was 1,046 kWh by his calculation (46,958 minus 45,912), in line with his prior-year winter usage [meter_photos_and_readings.pdf p.1].

Tri-River's online usage history, printed January 21, 2026, shows for this account: "Meter exchange recorded August 2025. New meter 74120983." Mr. Pennington has no work order or notice of any exchange [meter_photos_and_readings.pdf p.1]. His meter still bears number 74120938, as the photographs show.

Back-billing. The $749.83 bill of December 9, 2025 follows from the above. On the records we have, the bill appears to rest on reads that do not come from Mr. Pennington's meter.

Shutoff or threatened shutoff

On January 12, 2026, Tri-River issued a Notice of Disconnection for account ending 5521 stating that service "may be disconnected on or after January 27, 2026 unless the past due amount is paid or payment arrangements are made." The notice claims a past due amount of $989.37 [shutoff_notice_and_dispute_log.pdf p.1]:

ItemAmountSource
Nov 8, 2025 bill$215.39[shutoff_notice_and_dispute_log.pdf p.1]
Dec 9, 2025 bill$749.83[shutoff_notice_and_dispute_log.pdf p.1]
Late fees$24.15[shutoff_notice_and_dispute_log.pdf p.1]
Total past due (as read from the notice)$989.37[shutoff_notice_and_dispute_log.pdf p.1]

The late fees were added on December 9, 2025 ($10.77) and January 9, 2026 ($13.38) [disputed_and_prior_bills.pdf p.1]. Every bill in the past due amount falls within the disputed period.

A resident of the home, Loretta Pennington, uses a home oxygen concentrator around the clock. On January 14, 2026 at 3:22 p.m., her physician, Dr. Imelda Corrigan of Bellwood Family Medicine, faxed a medical certificate to Tri-River Customer Care (fax confirmation: 2 pages, OK). The certificate states: "Loss of electric service would be a serious threat to her health." [shutoff_notice_and_dispute_log.pdf p.1] Mr. Pennington had already told Tri-River about the oxygen on January 13, 2026 [shutoff_notice_and_dispute_log.pdf p.1]. [ADD: whether Tri-River has acknowledged the medical certificate]

Tri-River's January 23, 2026 letter did not withdraw the disconnection notice. It stated only that "A field order for meter verification has been issued. Your account remains past due." It gave no date for the verification [shutoff_notice_and_dispute_log.pdf p.1].

Dispute history

Mr. Pennington has raised this dispute repeatedly [shutoff_notice_and_dispute_log.pdf p.1]:

  • September 12, 2025. He called Tri-River about the estimated September bill. The agent said estimates would "true up" with the next actual read.
  • October 24, 2025. He paid the October bill ($204.23) and wrote "paid under protest, estimated bills disputed" on the payment stub. He had paid the September bill ($195.55) on September 25, 2025 [disputed_and_prior_bills.pdf p.1].
  • December 18, 2025. He called about the $749.83 bill (reference no. CC-88214, agent "Brenda") and asked for a meter test. He was told a test costs $45.00 and would be scheduled. No one came.
  • January 5, 2026. He called again (reference no. CC-90377) and said the meter number on his bill is his neighbor's. The agent said she would send it to the metering department.
  • January 13, 2026. He called about the shutoff notice (reference no. CC-91102) and told Tri-River about his wife's oxygen. The agent said a medical certificate was needed and to fax it.
  • January 14, 2026. The medical certificate was faxed, as described above.
  • January 16, 2026. He filed an informal complaint with the Kentucky Public Service Commission online, reference no. 2026-INF-00317.
  • January 23, 2026. Tri-River wrote that a field order for meter verification had been issued, with no date, and that the account remains past due. The disconnection notice was not withdrawn.

Legal basis

Tri-River's tariff and rules set out how it must bill, test meters, and handle billing disputes and disconnection. Whatever rules apply to estimated reads, back-billing, meter testing and shutoff, they apply to the bills at issue here. [VERIFY: whether the Kentucky utility commission regulates this utility, or it is municipal or a cooperative] Mr. Pennington's informal complaint to the Kentucky Public Service Commission is pending under reference no. 2026-INF-00317 [shutoff_notice_and_dispute_log.pdf p.1].

We expect Tri-River to follow its own tariff and the applicable Kentucky requirements on the following points:

  • Estimated reads and back-billing. [VERIFY: Kentucky rule on back-billing and estimated reads]
  • Disconnection while a billing dispute is open. [VERIFY: Kentucky rule on shutoff during a billing dispute]
  • Disconnection where a physician certifies a medical need for service. [VERIFY: Kentucky rule on medical certificates and shutoff]

Demand

On behalf of Mr. Pennington, we ask that Tri-River do the following by [ADD: response deadline]:

  • Test the meter. Inspect and test the meter serving 418 Sycamore Run Road (faceplate number 74120938) and the meter bearing number 74120983. Confirm in writing which meter is, and has been since August 2025, assigned to account ending 5521. Give us and Mr. Pennington advance notice of the date so he can be present. [ADD: confirm whether to request waiver of the $45.00 test fee quoted on December 18, 2025]
  • Produce records. Provide any work order for the August 2025 meter exchange, the test results, and the meter number and meter source of the 41,880 and 52,380 reads on the December 9, 2025 bill.
  • Correct the bills. Rebill August 6 through December 5, 2025, and any later period billed under meter number 74120983, using actual usage registered on the meter serving 418.
  • Credit or refund. Credit or refund any amount Mr. Pennington has paid or been charged above the corrected charges, including any part of the $195.55 and $204.23 he paid.
  • Remove late fees. Remove the late fees of $10.77 and $13.38 and any later fee on the disputed bills [firm notes; disputed_and_prior_bills.pdf p.1].
  • Confirm no shutoff. Withdraw the January 12, 2026 Notice of Disconnection and confirm in writing that service will not be disconnected while this dispute, the meter test and Commission complaint no. 2026-INF-00317 remain open. Note on the account the January 14, 2026 medical certificate [firm notes].
  • Payment. Pay [ADD: demand amount, if the firm seeks payment beyond the credit, refund and removal of late fees].

Please preserve all records on this account and on the meter at 418A, including meter exchange and field work orders, meter read data, billing records, and recordings or notes of the calls under reference nos. CC-88214, CC-90377 and CC-91102.

Mr. Pennington reserves all rights and remedies. Please direct all communications about this matter to our office.

Sincerely,

Meredith L. Ashby
Ashby Calhoun PLLC